Project 4

Mary Gates Hall (University of Washington)-Photo by Mauro Ferreira
Major Electric completed the DDC Control System at the Mary Gates Hall  shown above.
The building is one of the many historical buildings on the University of Washington Campus and
was architecturally very challenging. Major Electric is very proud to have been entrusted with this project.